Primary School in Pomezia

Demolition and reconstruction of the primary school
Cultural
Primary School in Pomezia

Project: Cultural
Location: Pomezia, Italy
Client: Municipality of Pomezia
Year: 2022 – ongoing
Area: 1900 sqm
Activities: Feasibility study, final design, executive project, construction supervision, and safety officer
Designers: gamp! – NEMA – Studio Peroni – Studio Favuzzi
Result: First prize
Photographs: Davide Curatola Soprana

A simple and compact school building from a volumetric perspective, clear in its functional organization and regular in its structural grid. The new school is located on the site of the existing building and is characterized by a unitary volume, articulated on two levels, to accommodate the required areas. The compactness of the building allows the connective spaces to be concentrated in the “central nave” of the structure, with double-height spaces, ensuring efficient distribution of the school’s areas.

On the ground floor, the connective space is also made usable thanks to its permeability and visual transparency, through the various double heights. In this environment, collective educational and recreational activities can be carried out, thanks to the two stepped seating areas that also connect the two floors.

The southern facade features a double-height portico that provides sun protection for the classrooms and the canteen areas, allowing for outdoor educational activities.

case-ville-montefiascone-B-2B-studiogamp.it

Other projects